You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Saluran Air di Ulujami Rampung
.
photo Tiyo Surya Sakti - Beritajakarta.id

Sheet Pile Repairs in Ulujami Completed

The sheet pile repairs located on Jalan Mairin, RT 09/03, Ulujami Urban Village, Pesanggarahan Sub-district, South Jakarta, finally completed.

We also build a sloof over the water channel

Pesanggrahan Sub-district SDA Executing Unit's Field Coordinator, Halim stated the channel repairs are conducted to follow up on proposals from local environmental administrators.

"We also build a sloof over the water channel," he expressed, Monday (7/1).

Sheet Pile Repair on Jalan KH Mas Mansyur Completed

He explained the sheet pile itself has a length of 12.5 meters with 70 centimeters wide and 90 meters high. The work which started on June 12, 2024, involved five personnel.

Hopefully, the channel could accommodate large quantities of water to anticipate flooding in the rainy season.

"Now, it's finished and good, we build the sloof 30 centimeters thick to hold water when the water flow starts to get high," he added.

The work above received appreciation from one of the residents, Andi (47).

"Thank you for the quick response and work," he stated.

Linked News
Popular News indeks
  1. Pramono Prioritizes Construction of Cakung Regional Hospital

    access_time18-04-2025 remove_red_eye452 personFakhrizal Fakhri
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye383 personBudhi Firmansyah Surapati
  3. Jakarta Hosts The UN Tourism 37th CAP-CSA Joint Commission Meeting

    access_time16-04-2025 remove_red_eye313 personAldi Geri Lumban Tobing
  4. Free Transportation Services to Facilitate Residents' Mobility

    access_time17-04-2025 remove_red_eye308 personDessy Suciati
  5. Pramono: Silaturahride Route Must Not Pass Casablanca JLNT

    access_time17-04-2025 remove_red_eye261 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik